Historical Railway Photograph Gallery 2101-2150

2051-2100<-

Photos 2101-2150

->2151-2200

Photo ELR Branch Subject Location M C Elev'n Date Time

bpm02101.jpg
WYE Wye Valley Jct & Monmouth Reciprocal view of frame 2100 showing single line just north of abandoned Tintern quarry stone handling plant       North    

bpm02102.jpg
WYE Wye Valley Jct & Monmouth Well overgrown bullhead single line north of Tintern quarry       South    

bpm02103.jpg
WYE Wye Valley Jct & Monmouth The last section of bullhead rail and non-railed bullhead chairs on timber sleepers, north of abandoned Tintern quarry stone handling plant       South    

bpm02104.jpg
WYE Wye Valley Jct & Monmouth View of abandoned single line at site of abandoned Tintern quarry stone handling plant       SE    

bpm02105.jpg
PTH Penarth South elevation of Dingle Road halt when both lines were in use and branch was still open as a through route to Cadoxton. Only the left hand line survives as the up/down line to Penarth terminus. Dingle Road halt     South    

bpm02106.jpg
PTH Penarth View looking towards former Alberta Place halt while line was still open as a through route Just south of Penarth station     North 09-Oct-66 15.10

bpm02107.jpg
MHD Minehead 4561 prairie loco' with a 42XX class 2-8-0 loco' at Minehead station sidings       West    

bpm02108.jpg
MHD Minehead Odney Manor loco' 7828 at Minehead station sidings       West    

bpm02109.jpg
MHD Minehead 2-doll starting bracket signal. Minehead station, Somerset       NW    
bpm02110.jpg     Spare            
bpm02111.jpg     Spare            
bpm02112.jpg     Spare            
bpm02113.jpg     Spare            

bpm02114.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) Permanent way new installation at Lydney yard and new level crossing       South    

bpm02115.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) Mechanical detection and part-assembled double ground disc unit at Lydney Jct station during re-modelling by Dean Forest Railway Co       East    

bpm02116.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) Lydney Jct signal box in course of construction Lydney new road level crossing north of Lydney Main line station and yard     East    

bpm02117.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) New permanent way at Dean Forest Railway signal box north of Lydney yard Lydney new road level crossing north of Lydney Main line station and yard     South    

bpm02118.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) Electrically-driven points immediately north of Station Road level crossing and alongside DFR signal box Lydney new road level crossing north of Lydney Main line station and yard     North    

bpm02119.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) Looking south across Whitecroft level crossing before line was brought back into passenger use Whitecroft level crossing, Forest of Dean     North    

bpm02120.jpg
CAM Cardiff (Queen St) and Merthyr Spare            

bpm02121.jpg
PRS WAL Penrhos/Walnut Tree) Former Penrhos junction after complete removal of all track New road superseding old narrow road over 3-arch bridge at Penrhos junction          

bpm02122.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) Lydney Jct signal box in course of construction fror Dean Forest railway North end of Lydney yard          

bpm02123.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) New track and motored points at Lydney junction Just north of new Lydney bypass level crossing          

bpm02124.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) REME involvement in re-instating trackwork at former Lydney Jct station site.             

bpm02125.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) REME involvement in re-instating trackwork at former Lydney Jct station site. PW Supervisor Mr Mervyn Thomas in attendance            

bpm02126.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) REME involvement in re-instating trackwork at former Lydney Jct station site. PW Supervisor Mr Mervyn Thomas in attendance            

bpm02127.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) REME involvement in re-instating trackwork at former Lydney Jct station site. PW Supervisor Mr Mervyn Thomas in attendance            

bpm02128.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) REME involvement in re-instating trackwork at former Lydney Jct station site. PW Supervisor Mr Mervyn Thomas in attendance            

bpm02129.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) REME involvement in re-instating trackwork at former Lydney Jct station site. PW Supervisor Mr Mervyn Thomas in attendance            

bpm02130.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) Permanent Way director Mr Mervyn Thomas, Dean Forest Rly, inspecting rail spares in connection with REME assistance in installing new track at Lydney yard Lydney yard          

bpm02131.jpg
BDL Barry Docks Lines Earthworks re-modelling south of former PW Yard, Barry. View taken from former footbridge at Low Level goods depôt. The course of the ramp line from HL to LL had only recently had the track removed but the STOP board is still standing. Footbridge (now removed) over former Barry low level goods yard          

bpm02132.jpg
BDL Barry Docks Lines Earthworks re-modelling at site of former PW Yard (Later Dai Woodham's HQ) at Barry. View taken from former footbridge at Low Level goods depôt The course of the ramp line from HL to LL had recently had the track removed but the STOP board is still standing and the rails are still in the level crossing. Footbridge (now removed) over former Barry low level goods yard          

bpm02133.jpg
BDL Barry Docks Lines Four-track level crossing immediately north-east of former Powell Duffryn Tank Farm, low level goods yard area, Barry, after complete track removal from this side of No.1 Dock. East of former Barry low level goods yard          

bpm02134.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) Then newly laid track for proposed second platform at new Lydney Jct station site Lydney yard          

bpm02135.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) Then newly laid track for proposed second platform at new Lydney Jct station site. The line is now in use and the electricity pole has been relocated. Lydney yard          

bpm02136.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) Then newly laid track for proposed second platform at new Lydney Jct station site. The line is now in use and the electricity pole has been relocated. Lydney yard          

bpm02137.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) New permanent way and trackbed for Dean Forest Railway at Lydney former S&W station site (Lydney Yard) Lydney Yard          

bpm02138.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) Then newly installed permanent way and part assembled double ground disc  for Dean Forest Railway remodelling at Lydney yard North end of Lydney yard          

bpm02139.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) Side view of part-assembled double ground disc unit North end of Lydney yard          

bpm02140.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) Almost-completed signal box and as-installed level crossing for Lydney bypass road (A48), prior to completion North end of Lydney yard          

bpm02141.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) Motorised points and track operation rodding as Then newly installed for Dean Forest Railway new layout at Lydney A48 bypass level crossing. North end of Lydney yard          

bpm02142.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) Part assembled triple ground disc and mechanical detection at remodelling of track layout, former lydney yard. New signal box and level crossing at north end of Lydney yard          

bpm02143.jpg
SAW Berkeley Rd & Speech House Rd (Coleford Branch) Then newly laid track as viewed from new signal box at new level crossing north of Lydney yard New signal box and level crossing at north end of Lydney yard          

bpm02144.jpg
  GWR Steam Centre, Didcot View of a slotted-post semaphore signal assembly. The upper arm is in the 'off' position and therefore, it has dropped down into the split post. The red spectacle has pivoted anticlockwise to clear the lamp lens and at night would have shown a lunar white light. GWR Steam Centre, Didcot          

bpm02145.jpg
  GWR Steam Centre, Didcot View of a slotted-post semaphore signal assembly from the rear. The upper arm is in the 'off' position and therfore not visible as it has dropped down into the split post. GWR Steam Centre, Didcot          

bpm02146.jpg
  GWR Steam Centre, Didcot A fixed GWR distant semaphore in its pre-1927 colours GWR Steam Centre, Didcot          

bpm02147.jpg
  GWR Steam Centre, Didcot 2-doll wooden bracket signal assembly. Note the very long lever arm connecting the small semaphore arm with the vertical rodding at the main post GWR Steam Centre, Didcot          

bpm02148.jpg
  GWR Steam Centre, Didcot Centre pivot GWR ft wooden semaphore arm in the off position GWR Steam Centre, Didcot          

bpm02149.jpg
  GWR Steam Centre, Didcot Laid example of dual-gauge track, Brunel's 7ft with standard             4'-8½", showing changeover of common rail via a turnout. A disc & crossbar signal is also to be seen. GWR Steam Centre, Didcot          

bpm02150.jpg
  GWR Steam Centre, Didcot Traps with sand-drag at level crossing within Didcot Steam Centre site GWR Steam Centre, Didcot          

2051-2100<-

Photos 2101-2150

->2151-2200

Date Last Revised:November 30, 2009